INFRASTRUCTURE OPTIMISATION

Proactive Data Centre Maintenance

Overview

Proactive Maintenance

Secure I.T. Environments provides a planned preventative and proactive data centre maintenance service to the commercial, financial, retail, NHS, education and hosting sectors. If your critical systems are not protected or maintained, the cost of repairs and downtime can be damaging to any organisation.

GET STARTED

Our Approach

We are flexible in our approach to maintenance, so we do not disrupt business operations. A schedule of diary dates will be provided for support in pre-booking any scheduled visits, associated RAMS and pre-site inductions will be in order prior to each service visits. Continuity of engineers attending site is recommended ensuring consistency of all service calls.
Emergency out of hours calls are all dealt with effectively and efficiently by our trained staff, ensuring the correct procedures are followed at all times, response times upheld, and any faults rectified as a priority.
Detailed reports will be submitted following each service visit, highlighting any remedial works recommended, ensuring that at all times your critical infrastructure is fully operational and all SLA’s are achieved.

Friendly & Professional Service

High Level of Support

Detailed Reports

Flexible Approach

How It Works

Our in-house maintenance division provides data centre maintenance support 365 days of the year to clients. We offer a wide range of preventative maintenance cover from standard to fully comprehensive for all infrastructure equipment.
This combined service allows the smooth running of the data centre maintenance which will be handled by our friendly professional team who will arrange all the service visits, log any emergency call outs and ensure that all follow up documentation is kept up to date.

Why Choose Us

With our 18-year history in data centre maintenance service, we pride ourselves in offering a professional high level of support to all our clients. Our friendly professional team will organise and run everything from preventative annual maintenance visits to reactive emergency callouts.
Many of our clients have stayed with us following our initial data centre room build and have considered our after maintenance service a valuable asset to their organisation.

WHAT TO KNOW

What to Consider when Building A Data Centre

Power Usage Effectiveness (PUE)

PUE is an important measurement of energy efficiency in Data Centres, providing the metrics needed to make informed green efficiency changes in Data Centre infrastructure. With the cost of power rising, an efficient Data Centre Design not only delivers cost benefits to your organisation but is considerably less damaging to the environment.

Many low capital cost approaches in energy efficiency with often just small changes can save businesses thousands of pounds a year. PUE efficiency compares the total power energy used by a facility with how much is used by the IT components. The closer the figure is to 1.0, the more efficiently the facility is operating.

Planned Preventative Maintenance

To ensure all equipment is in working order and will perform as designed in both normal operating conditions and an emergency, regular maintenance inspections must be planned and completed according to the manufacturer’s recommendations. The service inspections provide the end user with the confidence that their Data Centre is operating at its best.
We provide a range of UPS, generator, air conditioning, and fire suppression maintenance services, ranging from simple repair to 24/7 support contracts with guaranteed response times.

Remote monitoring

An early warning alert can prevent a situation from reaching a critical point of no return. Our support team offers customer UPS monitoring that detects any changes or errors in your system. Our automated management system monitors the environment and identifies even minor problems, sending alerts immediately and informing relevant personnel. Many monitoring systems can be remotely monitored via global operations architecture, via the cloud.

LEARN MORE

How to build a Data Centre for your business?

Whether traditional, containerised or modular our energy-efficient scalable approach to any challenge is developed to align with the overall strategy of each business client, ensuring we optimise every data centre design and future fit-out at every stage.

With an in-house data centre design and build team of engineers, we fully support our customer-preferred architecture solution, working closely with you to ensure your data centres are running seamlessly and meeting your requirements. Utilising the latest efficient data centre cooling systems and infrastructure industry standards, we ensure no disruption to mission-critical services or business continuity operations, giving you peace of mind when working with Secure IT Environments.

Get in touch with the team today!

Taking Care of
Everything You Need

Design And Build

From initial concept through to handover, we deliver turnkey data centre solutions tailored to your needs.

Maintenance

Our expert teams provide ongoing maintenance to ensure your data centre remains secure, efficient, and fully operational.

Modular Data Centres

Fast, flexible, and scalable — modular builds help you adapt to changing business demands with minimal disruption.

Containerised Solutions

Self-contained, portable data centres built for rapid deployment and optimal performance in any environment.

Upgrades and Refurbishments

We help modernise existing infrastructure, improving performance, security, and energy efficiency.

Secure Environments for Critical Infrastructure

Specialist design and implementation for high-security, mission-critical environments across government and commercial sectors.

FAQ

Answers to the Most
Common Questions

A data centre design and build service provides end-to-end solutions for creating a data centre. This includes planning, designing the infrastructure, and actual construction, ensuring an efficient and functional facility.
There are three key areas to consider when planning to build a new data centre to ensure the project meets the needs of the organisation it’s designed to serve: existing facilities, the organisation’s business needs, and the data centre technology environment. Having answers to specific questions in these three areas will put your organisation in a position to make the best choice for design, build, installation, and start-up of your new data centre.
Key to understanding how to plan and build a new data centre is knowing the details of your existing data centre setup and capacity, whether that is your own facility, a colocation provider, or a cloud service.
Getting a clear picture of what already exists helps determine if building a new data centre is indeed the right option. In this digital age It’s possible that colocation, outsourcing, or a cloud or hybrid model could best meet your organisation’s data centre needs.
As part of this evaluation process, it’s also critical to understand the goals of the business, and how the data centre meets the needs of the company. A key part of this is understanding the scale of IT in the organisation, as well as how the data centre and its operations align with the business. That requires looking closely at how much data the business deals with, how it is gathered, stored, and accessed, what contact uses the data and how, and the relevant industry standards the data centre must comply with.
After getting a good sense of organisational goals and how the existing facilities are serving the business, and could you scale this down. it’s also critical to understand the company’s technology and data center physical environments.
Data centre projects are complex undertakings. When it’s done right, a brand new data center will support your business objectives and meet current and anticipated future needs. The way to set up your organisation for success with this project is to understand existing data centre facilities, know the business needs of the organisation, and have knowledge of the necessary data centre and technology environment.
Buildings used as storage facilities are most often located in the suburbs, areas with uninterrupted power supply. The centres are built in a fenced area that is protected from unauthorised intrusion. Data centres are located in one- or two-storey buildings, in buildings using modular construction techniques or containerised units. They can also be built internal or external of a main building
The data center houses switching routing and storage hardware. The function of that hardware depends on the type of data center. There is also generally a large amount of power and cooling equipment as well as admin space. Some data centers are for access from a customer to a business’s serve
Sometimes they can be found in the city centres, refurbishing industrial buildings, storage facilities, and hangars. Buildings must meet strict requirements, must be selected based on the load-bearing capacity of walls and floors, and the materials used for construction.
To ensure an uninterrupted power supply, two mains from different substations, battery packs and emergency diesel generators are normally used. Switching to the emergency power supply is performed in milliseconds, so the risk of losing company data is minimised.
The timeframe can vary based on the size, complexity, and specific requirements of the project. Generally, smaller data centres might take a few months, while larger or more complex projects can extend to over a year.
Several factors are considered, including the client’s capacity needs, scalability, redundancy, cooling and ventilation systems, energy efficiency, and security measures. The geographical location and potential natural disaster risks are also evaluated.
We adopt the latest technologies and best practices, such as using energy-efficient hardware, advanced cooling systems, and renewable energy sources when possible. Regular energy audits also help in maintaining efficiency.
Absolutely. Our designs often incorporate modular elements that allow for easy expansion, ensuring the facility can evolve with growing data needs.

Costs can vary widely based on the size, location, technologies used, and other factors. We recommend reaching out with specific project details for a tailored estimate.

Data Centres

Case Studies

What are the requirements to build a data centre?

Glangwili Hospital – Carmarthen Wales

Queen Elizabeth Hospital Kings Lynn

Essex Partnership University NHS Foundation Trust

Testimonials

What Our Clients Say

Have any questions?
Feel free to contact us

Our Blog

Latest Articles

What Are Vertical Design Accelerators and Why They Matter in Modern Data Centre Projects

Designing a data centre often feels like standing at the base of...

Edge Data Centres and Low Latency Infrastructure – What does it mean?

The rise of edge data centres is quietly reshaping how digital services...

Supporting the NHS with Reliable and Energy-Efficient Data Centres

In the healthcare industry, the need for reliable and efficient data centre...